PERM Tracker
Live DOL data · Automatic deadlines
Skip to main content

Updated

PERM sponsor, #1,578 of 70,985 by filings

IMA America Corporation

IMA America Corporation sponsors green cards: it filed 1 PERM case in the last 12 months, the newest on October 12, 2026. IMA America Corporation has 1 PERM case waiting with DOL.

Main job
Industrial Machinery Mechanics · 48% of its filings
Main worksite
Morrisville, NC · 52% of its filings
Industry
Sawmill, Woodworking, and Paper Machinery Manufacturing · NAICS 333243

Waiting on a case with IMA America Corporation?

  • When it'll likely be decided
  • An email when DOL moves it

It's on your ETA-9089 receipt. It goes into the page's address, so you can bookmark the result.

Don't have the number? Find it among their filings.

Or follow this employer by email

Too few cases for a rate

27 decided filings: too few for an approval rate.

Why

Across every PERM case DOL decided in this window, 3.20% were denied. At that rate a file this size comes back clean most of the time whatever the sponsor did, so a percentage would be a fact about how few cases there are. Telling a clean record apart from the field takes about 117 decided cases.

Filings

27

#1,578 of 70,985

Certified

27

0 denied

Approval

Not shown

withheld: 27 decided

Median wage

$69,451

offered, per year

Median days

459

7 faster than the field

Right now

DOL's live record of its cases, read every day, and what it has done to them as a group.

In the queue right now 28 cases in the live tracker

Waiting on a decision

1

of 28 tracked cases. The other 27 have been decided.

The oldest one still waiting was filed October 12, 2026.

Where those 1 are standing

ANALYST REVIEW
1100%

A Department of Labor analyst has the application. This is the main queue, and it is where most pending PERM cases sit.

None of this changes one case's wait: DOL works one national line. Where DOL is working now is the figure that does.

From DOL's live status of 28 of this sponsor's cases: read this share against 28, never against the lifetime filings above. Live case tracker, as of October 21, 2026

Follow IMA America Corporation

An email when DOL moves its cases as a group: five or more on or off hold in a day, or a batch decided well above its usual pace.

What DOL has done to its cases as a group

Nothing employer-wide since this site's record began on August 27, 2026.

You confirm by email first. One click turns it off.

Its newest filings

Filed since DOL's last quarterly file, so the wage and law firm aren't published yet.

Every filing by this employer is in the case search, live and published together.

Source: DOL's own case-status service, flag.dol.gov, where any of these numbers can be looked up. A filing shows there soon after it's made, months before DOL's quarterly files.

How long it takes

How long their cases are taking

  1. Every employer

    median of 30,289 decisions in the same 90 days

    302 days

None of their cases were decided in the last 90 days, too few for a median of their own. Filing to decision, over decisions we watched DOL make; withdrawals left out.

Filed today: a new case joins the same line as anyone's, behind 80,222 cases, and would be decided around March 18, 2027 (between February 26, 2027 and April 27, 2027). Estimate another date

Every program

Across DOL's programs

The wage request, the PERM and the H-1B labor condition application, one line each.

PERM (green card)
27 published
1 pending
$69,451 median, n=26
Prevailing wage requests
3 published
0 pending
3 wages, under the floor
H-1B labor condition applications
0 published
0 pending
no wage published

Every case across these programs is in the search.

How these are counted

Its newest wage requests and LCAs

Filed by IMA America Corporation, newest first. Decided ones carry the wage from DOL's quarterly files.

Wage requests

All wage requests by this employer

H-1B LCAs

None confirmed yet.

All H-1B LCAs by this employer

Source: DOL's own case-status service, flag.dol.gov, where any of these numbers can be looked up. A filing shows there soon after it's made, months before DOL's quarterly files.

Against other sponsors

Where it sits among 70,985 sponsors. The full ranking sorts every column.

Each figure ranked only among sponsors with enough cases for it to mean something. No single score: they measure different things.

  • PERM filings in the last 12 months

    1 filed in the last 12 months

    Higher than 22% of the 13,997 sponsors that filed in the last 12 months.

Position in the field 1,343 sponsors with 30+ decided

Approval rate

not shownunder 30 decided

0% 100%

Median days to decision

459 daysmiddle of 27 decided, too few to rank

5d 1152d
Each bar counts sponsors at that value. More
Each bar counts sponsors at that value. Sponsors with fewer than 30 decided cases are left out of the population rather than plotted, because a rate over a handful of cases lands wherever the handful landed. This sponsor has 27 decided cases, so its median days is marked but left unranked, and no approval rate is drawn at all.
DOL PERM disclosure files

Against the sponsors ranked nearest

The 120 sponsors ranked nearest filed between 26 and 28 filings.

Their median wait
463 days
This one
459 days

This one sits 4 days ahead of them.

Why no approval rate

Where this sits in the ranking

Ranked 1,578 of 70,985 by volume: 1,577 filed at least as many filings, and 69,407 filed no more.

Just above
Applied Intuition, Inc. 27 filings
Just below
Cloudspace LLC 27 filings

Sponsors filing at the same rate

Ranked either side of this one: they file about as many PERM cases.

Sponsors hiring for the same work

The employers filing the most PERM cases for Industrial Machinery Mechanics, the occupation this sponsor files for most.

What they file, and where

A rank says how much. It says nothing about what the work is, which is the part a job offer from this sponsor turns on.

What the jobs are

Industrial Machinery Mechanics

SOC 49-9041.00 · 13 filings, 48% of everything they file

How this is counted

The industry they declared

Sawmill, Woodworking, and Paper Machinery Manufacturing

NAICS 333243 · 27 filings

How this is counted

Where the jobs are

  • North Carolina 14
How this is counted

Where the work is

  • Morrisville, NC 14
How this is counted

Who files for them

  1. Brown Immigration Law 27 filings
How this is counted

Newspapers it advertised in

  1. The News and Observer

    27 cases
How this is counted

Additional steps it used

  1. Job search websites

    14 cases
  2. Radio or TV ads

    14 cases
  3. Local or ethnic newspapers

    13 cases
  4. The employer's website

    1 cases
How this is counted

How long before filing it began

  1. Under 30 days

    0.0%
  2. 30 to 59 days

    0.0%
  3. 60 to 89 days

    0.0%
  4. 90 to 119 days

    7.4%
  5. 120 to 149 days

    15%
  6. 150 to 180 days

    59%
  7. Over 180 days

    19%
How this is counted

Where every PERM employer recruits

History

Year by year since 2008

28 PERM decisions from FY2008 to FY2026, busiest in FY2024 with 13.

  • certified
  • denied
  • withdrawn

Fiscal years, October to September. A year filed under another name is missing, not zero. FY2026 is partial: DOL's newest file runs through June 2026.

Every year as a table
Fiscal year Certified Denied Withdrawn
FY2008 1 0 0
FY2009 0 0 0
FY2010 0 0 0
FY2011 0 0 0
FY2012 0 0 0
FY2013 0 0 0
FY2014 0 0 0
FY2015 0 0 0
FY2016 0 0 0
FY2017 0 0 0
FY2018 0 0 0
FY2019 0 0 0
FY2020 0 0 0
FY2021 0 0 0
FY2022 0 0 0
FY2023 0 0 0
FY2024 13 0 0
FY2025 2 0 0
FY2026 12 0 0

Notes on these numbers

What these numbers don't say

5 notes
The wage is the job, not the payer
Their filings are led by Industrial Machinery Mechanics, 13 of 27. The median offered wage moves almost entirely with what roles they file. A software developer and a poultry cutter are different numbers wherever they are filed, so this figure is not plotted against the field and no percentile is given for it: that comparison would rank occupation mix and call it pay. Wages by occupation are on the wages page.
Volume doesn’t change the wait
DOL works a single national queue, oldest first, whoever filed the case, so these 27 filings bought no priority: a company with four thousand waits exactly as long as one with three.
The name is a legal entity
DOL prints whatever went on the form, and here that name ranks 1,578. A group that files through several subsidiaries appears as several rows, and one that files everything through a parent appears once, so a rank is a rank among printed names rather than among companies.
A median over 27 decided cases
The queue is national and first in, first out, so this figure follows when the cases were filed as much as it follows the sponsor.
Two sources, and they do not add up
The filing counts come from DOL's disclosure files, where every row already carries a decision date, so nothing pending is in them. The queue figures come from a live per-case tracker with its own coverage and its own as-of date. Subtracting one from the other gives a number that means nothing. The worksite on most of these is NC. Where the queue stands overall is on the processing times page.

The window these figures cover: DOL's PERM disclosure files for fiscal years 2024 to 2026, through the third quarter of 2026, 373,939 decided cases. Nothing pending is counted here. How each figure is built

Case data: DOL quarterly disclosure files (flag.dol.gov) · data through Jun 30, 2026 · quarterly

Employers and firms: Derived from DOL's disclosure files · data through Jun 30, 2026 · rebuilt with each quarterly load

Per-case statuses: flag.dol.gov/recaptcha/caseStatus (DOL, direct) · data through Oct 21, 2026 · daily

What each source includes
Cite this page